Selection of technology for medium-sized wastewater treatment plants
We specialise in comprehensive implementation of investment projects for medium-sized wastewater treatment plants (RLM 5,000 – 10,000), with professional selection of technology tailored to local conditions, legal requirements and investor expectations. Our approach is based on a combination of proven engineering expertise, modern technological solutions and practical experience gained during the implementation of numerous municipal and industrial projects.
What do we offer in terms of technology selection?
Baseline analysis and audit of the existing conditions
We perform analyses of wastewater quality, site conditions, hydraulic loads and contaminant loads. We also consider the existing infrastructure, development needs, as well as local environmental and planning conditions.
Adjustment of treatment technology to a specific location
We offer solutions based on, among other things:
- sequential biological reactors (SBRs),
- sequential reactors with continuous inflow and granular sludge - B-PFR
- activated sludge systems (BARDENPHO, MLE, UCT),
- membrane technology (MBR),
- fixed-bed biological reactors (IFAS/MBBR),
- integrated treatment systems with chemical support or final filtration.
Effective and cost-efficient design
Each technological design is analysed in terms of energy consumption, reagent consumption, operational ease and automation potential. It is our priority to ensure that investment costs go hand in hand with low operating costs.
Cooperation with the investor and local authorities
We consider the needs of residents, municipal development plans, the availability of external funding (NFOŚiGW, WFOŚiGW, EU funds) and the investor's financial capabilities.
Integration with SCADA and monitoring systems
We design automation systems and remote monitoring and reporting systems, which allow for full control over the treatment process and quick response in case of irregularities.
Why you should trust us
Our experience and professionalism enable us to ensure timely implementation of investment projects in accordance with the highest standards, including:
- development of a technological concept,
- preparation of project documentation and obtaining administrative decisions,
- comprehensive turnkey execution,
- start-up, operator training and post-implementation support,
- warranty and post-warranty service.
If you are planning to modernise or construct a medium-sized wastewater treatment plant, please contact us. We will choose a technology that will work reliably for years.