Extension and modernisation of the wastewater treatment plant in Chojna
Photo gallery: 1 of 3
Photo gallery: 3 of 3
Contract of 22.04.2024
Investor: Pakosław Municipality
Investment value: 12 287 574,54 PLN
Investment type: design and build
Technology type: FSB
Realization description
Extension and modernisation (construction works)
1. Design and construction of the entire facility:
- Extension and modernisation of the treatment plant on plots No. 723 and 724 – including equipment, landscaping and associated infrastructure
- Preparation of full project documentation for planning permission.
2. New technological facilities and equipment:
- Multifunctional biological reactor (second), complete process equipment: rotary blowers, electric gates, membrane diffusers, effluent pumps, centrifuges, step grating, sand separator
- Sludge dewatering and hygienization building and storage shed
3. Networks and connections:
- Extension/upgrade of sewage, water supply and energy networks – providing power to new facilities
4. Modernisation of internal installations:
- Replacement and modernisation of all installations: electrical, control and measurement (instrumentation), alarm, monitoring and visualisation.
3. Associated infrastructure:
- Sewage pumping station, averaging tank, main pumping station – renovation/installation of new equipment
- Photovoltaic installation
The upgraded treatment plant will increase capacity to serve the entire agglomeration (target value of 14,820 PE) – it currently operates at approx. 7,810 PE.