Extension and reconstruction of the wastewater treatment plant in Kcynia
KcyniaMunicipality of Kcynia
Photo gallery: 1 of 17
Photo gallery: 3 of 17
2021 - 2022
Investor: Municipality of Kcynia
Investment value: 9 982 502,70 PLN
Investment type: build
Technology type: Flow-through
Realization description
Scope of work – the investment project resulted in the construction of the following:
- raw sewage pumping station with gate valve chamber;
- screen and grit chamber building/blower station;
- flow distribution chamber;
- biological reactors;
- final settling tanks/clarifiers with pumping well;
- aerobic sludge stabilisation chamber (KSTO);
- pumping station for treated wastewater;
- social building/sludge dewatering and sanitisation station;
- pumping well;
- measurement of treated wastewater;
- measurement of raw sewage;
- foundation for a sewage analysis cabinet;
- sanitary installations;
- electrical power installations – within the scope of the designed facilities;
- instrumentation and control installations (ICA) – within the scope of the designed facilities;
- inter-facility networks,
- landscaping – terrain stairs,
- decommissioning of facilities: existing generator set, existing screen and grit station.