Extension and reconstruction of the wastewater treatment plant in Opatów
OpatówOpatów Municipality
Photo gallery: 1 of 17
Photo gallery: 3 of 17
2021 - 2022
Investor: Opatów Municipality
Investment value: 3 487 401,78 PLN
Investment type: build
Technology type: COMA-TEC flow-through type
Realization description
Scope of works anticipated during the extension and reconstruction of the treatment plant:
- construction of a biological reactor with secondary settling tank and sludge/sludge thickener – LINE II (construction including excavation protection and draining, technology and electrical engineering);
- retrofitting of existing treatment plant facilities with equipment and installations to increase the capacity of the plant and divert wastewater to a new biological treatment line;
- construction of new process pipelines and ducts and internal sewers – supplementation and minor reconstruction of existing networks;
- construction of new power, lighting and control lines
- extension and replacement of the control system of the treatment plant (software, control station) – technological supply;
- changes to installations due to current operational problems;
- construction of new footpaths (pavements) and grass seeding,
- in addition, repair of existing road surfaces is planned;
- renovation of the treated effluent outlet.