Thanks to the determination of the contractor, the Newater company, we have been able to complete this joint investment project and celebrate its opening today.

Artur Ciosek

Mayor of Dobroszyce Municipality

2021 - 2023

Investor: Gminna Gospodarka Komunalna Dobroszyce Spółka z o.o.

Investment value: 12 898 039,85 PLN

Investment type: build

Technology type: Flow-through

Realization description

Increasing the capacity of the treatment plant from 500 m³/d to approximately 820 m³/d. This corresponds to a maximum of 6,500 PE (population equivalent).

The scope of technological and construction works included, among others:

  • Installation of a new screen with a capacity of ≥ 50 l/s and construction of a vortex grit separator with grit washer.
  • Renovation or construction of a raw sewage pumping station and hauled waste receiving tanks.
  • Construction of a biological reactor with a dephosphatation, denitrification and nitrification unit.
  • Construction of secondary sedimentation tanks and sludge pumping stations.
  • Construction of a measuring chamber and coagulant station.
  • Renovation of the existing mechanical treatment building, extension of the blower station and sludge dewatering system.
  • Installation of an air biofilter, power generator, and process and electrical ducting including automation (instrumentation and control equipment).
  • Power plant with a new switchboard, as well as earthworks, roads, squares, pavements and landscaping.