Modernisation of the wastewater treatment plant - Bierutów
BierutówMunicipality of Bierutów
Photo gallery: 1 of 7
Photo gallery: 3 of 7
2023 - 2024
Investor: City and Municipality of Bierutów
Investment value: 5 572 049,25 PLN
Investment type: design and build
Technology type: Flow-through
Realization description
Scope of modernisation of the wastewater treatment plant:
- replacement of pumps along with installation of an automatic screen in the main pumping station at the wastewater treatment plant;
- renovation of the existing oxygenated chambers (biological block, right and left reactor);
- renovation of the existing tank for hauled waste reception;
- replacement of pumps at the excess sludge recirculation point from the bottom of the biological reactor;
- construction of a section from the newly built hauled waste pumping station to the pipeline directing sewage to the biological treatment unit;
- a new sludge press has been installed in the wastewater treatment plant building;
- extension of the hauled waste reception unit – construction of a new 30 m³ tank with a mechanical screen and the necessary fittings;
- the obtained average capacity is currently 2000 m³/day.
- comprehensive adaptation of a room for the purposes of a chemical laboratory.