przebudowa-i-rozbudowa-gminnej-oczyszczalni-sciekow-stolno-desktop

Reconstruction and extension of the municipal wastewater treatment plant – Stolno

Stolno
Municipality of Stolno

...

Reconstruction and extension of the municipal wastewater treatment plant – Stolno

przebudowa-i-rozbudowa-gminnej-oczyszczalni-sciekow-stolno-1

Photo gallery: 1 of 8

2023 - 2024

Investor: Municipality of Stolno

Investment value: 12 671 103,30 PLN

Investment type: design and build

Realization description

The scope of works included renovation of the existing buildings, structures, installations, power supply and control systems (ICA), as well as construction of a third circulation ditch with equipment, and construction of a utility building with installation of retention and equalisation tanks with a total capacity of 3 x 50 m³. 


The refurbishment included:

  • reception + mechanical wastewater treatment station,  
  • multifunctional pumping station consisting of:
    • sewage pumping station  
    • return sludge pumping station,  
    • excess sludge pumping station    
  • two biological ditches operating in series, acting as a biological reactor with activated sludge for simultaneous removal of carbon, nitrogen and phosphorus compounds, with an internal recirculation pumping station, 
  • technical and social building,   
  • sewage measuring chamber,   
  • sludge dewatering and sanitisation station building and excess sludge tank,  
  • secondary sedimentation tank and pumping station for floating parts,   
  • electrical power supply, control and lighting systems. 


The construction included: 

  • a third circulation ditch including technological equipment and instrumentation, control and automation equipment (ICA), and construction of a communication band around the tank, linked to the existing communication routes of the wastewater treatment plant,  
  • installation of three retention and equalisation tanks with a total capacity of 3 x 50 m³  
  • installation of equipment for retention and equalisation tanks, including power supply and control of a new electrically driven gate valve and an electromagnetic flow meter, as well as a system for monitoring the level of sewage in the tank complex,  
  • utility building.     

Are you interested in our offer? Contact us!