Reconstruction of the band pumping station in Frelichów
FrelichówChybie Municipality
Photo gallery: 1 of 4
Photo gallery: 3 of 4
2021 - 2022
Investor: Górnośląskie Przedsiębiorstwo Wodociągów S.A., Katowice
Investment value: 5 195 907,25 PLN
Investment type: build
Realization description
Scope of implementation:
- Replacement of three pumps of 0.1 m³/s and 0.5 m³/s, which together are expected to increase the pumping capacity of the pumping station to 1.1 m³/s;
- renovation of discharge pipelines by introducing UV-cured resin sleeves;
- replacement of ND400 and DN200 facility pipelines;
- installation of shut-off fittings on each pressure pipe;
- reconstruction of 3 pumping chambers;
- renovation of all concrete structures within the pool;
- renovation of the building exterior and interior;
- modernisation of the transformer station;
- replacement of the 15kV overhead power line;
- implementation of instrumentation for the pumps;
- implementation of a monitoring system including a telemetry system.