Reconstruction of the municipal wastewater treatment plant in Boniewo

Boniewo
Municipality of Boniewo

...

Reconstruction of the municipal wastewater treatment plant in Boniewo

przebudowa-gminnej-oczyszczalni-sciekow-w-miejscowosci-boniewo-2

Photo gallery: 1 of 40

We would like to thank NEWATER for their highly professional and swift execution of the project, which was completed with virtually no major issues. We and our residents are truly delighted with the result. Thank you very much!

Marek Klimkiewicz

Mayor of Boniewo Municipality

2023 - 2025

Investor: Municipality of Boniewo

Investment value: 11 337 788,22 PLN

Investment type: design and build

Technology type: SBR

Realization description

The investment involved the reconstruction of an existing wastewater treatment plant with a capacity of Qavg = 135 m³/d in Boniewo.

Investment objective:

Design and execution of reconstruction of the existing wastewater treatment plant with a capacity of Qavg = 135 m³/d in stage I and reconstruction of the existing technical infrastructure at the treatment plant in Boniewo, designed and executed in the design-and-construct mode.

Stage I

  • preparation of technical documentation, including obtaining opinions, agreements, permits and other documents required by law for the implementation of the investment project;
  • replacement of blowers with new ones;
  • receiving station with drive-on pad
  • reconstruction of the sewage pumping station;
  • balancing tank;
  • technical building with screen and grit chamber;
  • ventilation and gas extraction systems in the technical building,
  • main switchboard with power supply lines to facilities;
  • biological reactor with process technology, electrical installations and instrumentation and control equipment (ICA) with roofing;
  • secondary sedimentation tank with technology and electrical installation as well as instrumentation and control equipment (ICA);
  • sludge pumping station with technology, electrical installation as well as instrumentation and control equipment (ICA);
  • sediment stabilisation tank;
  • electrical works.

Stage II

  • renovation of the old wastewater treatment plant building (demolition, repairs, painting, new roofing, tank reconstruction, ventilation);
  • replacement of Superbos150 technology, including electrical installation as well as instrumentation and control equipment (ICA);
  • increase in photovoltaic power by 31.4 kWp
  • replacement of the belt press with a plate press with ventilation, electrical installation, control and measurement equipment, and gas detection;
  • reinforced concrete post-press sludge storage facility, with roofing;
  • garage with storage space and paved area around it;
  • reconstruction of fencing;
  • reconstruction of roads and squares.

After the upgrade, the treatment plant’s technological line consists of  the following facilities:

  • hauled wastewater receiving station – new facility,
  • raw sewage pumping station – existing facility, modernized,
  • shelter for the screen and grit chamber with grit washer – new facility
  • intermediate pumping station with valve chamber – new facility
  • biological reactor – new facility
  • measuring chamber for treated wastewater – new facility
  • social and technical building – existing, modernised facility, including:
    • zbiornik retencyjny, 
    • zbiornik tlenowej stabilizacji osadu, 
    • zagęszczacz osadu,  
    • stacja dmuchaw,
    • instalacja odwadniania i higienizacji osadu,
    • zaplecze socjalno-techniczne,
  • sludge storage shed – new facility