Reconstruction of the sewage treatment plant in Główczyce
GłówczyceGłówczyce Municipality
Photo gallery: 1 of 19
Photo gallery: 3 of 19
2024 - 2025
Investor: Główczyce Municipality
Investment value: 12 450 533,55 PLN
Investment type: design and build
Technology type: SBR
Realization description
1. Modernisation of the biological part of the treatment plant:
- Replacement of the existing biological reactor with a new system with activated sludge technology (e.g. BARD, SBR or equivalent).
- Reconstruction of the secondary sludge chamber and recirculation system.
- Upgrade of the aeration equipment: blowers and pipe/disc diffusers.
- Improvement of the denitrification and defosfatation process.
2. New technological facilities and equipment:
- Separation and extension of the mechanical treatment point (grate, grit chamber).
- Construction of a new retention or averaging reservoir.
- Installation of new pumps, valves, flow and level sensors.
3. Modernisation of the sludge management system:
- Construction/modernisation of a sludge dewatering station (e.g. belt/screw press).
- Sludge building or storage shed for dewatered sludge.
- Possibility of subsequent expansion with a hygienization plant (e.g. liming).
4. Control and instrumentation installations, SCADA, monitoring:
- Implementation of automation for process monitoring and control (SCADA).
- New control cabinets with PLC and HMI operator panel.
- Cable, control and power supply installations including emergency power supply.
5. Associated infrastructure:
- Reconstruction of internal roads, accesses, fencing.
- Construction of lighting and site drainage system.