Modernization, extension, and reconstruction of the sewage pumping station and the building at 18 Krępiecka Street in Świdnik
Photo gallery: 1 of 5
Photo gallery: 3 of 5
Contract of 07.10.2026
Investor: Przedsiębiorstwo Komunalne Pegimek Sp. z o.o w Świdniku
Investment value: 15 283 777,05 PLN
Investment type: build
Realization description
The contract covers the refurbishment, reconstruction and upgrading of the existing wastewater pumping station and tanker reception building, together with the construction of the associated technical infrastructure.
The project also includes constructing and reconstructing stormwater drainage and foul sewer networks, installing interconnecting pipework between structures, providing a gas service connection, upgrading the electrical power supply system, installing a PLC-based automation and control system, and integrating with the SCADA system.
The scope of works includes:
- excavation works with steel sheet piling support;
- construction of foundation slabs for the tank and biofilter;
- construction of reinforced concrete walls, floor slabs and stairs;
- installation of damp-proofing and waterproofing systems;
- masonry and finishing works;
- extension of the facility to include office, garage and storage space, functionally connected to the existing office and garage building;
- refurbishment and reconstruction of the tanker reception and pumping station building;
- installation of an overhead travelling crane;
- reinstatement of paved surfaces and site landscaping.
Works at the existing wastewater pumping station include:
- construction of a new raw wastewater tank with mechanical pretreatment facilities;
- upgrading of chamber K1;
- installation of electrically actuated channel penstocks;
- supply and installation of step screens;
- installation of flushed screenings troughs, a screenings washer compactor and screenings conveyors;
- supply and installation of the main pumps;
- installation of process pipework;
- installation of valves and associated fittings;
- installation of a process air system;
- construction of a biofilter for odorous air treatment;
- upgrading of the reception station for tanker-delivered wastewater;
- process commissioning.